Roads.

Cleveland Redland Bay Road Upgrade

Client: Seymour Whyte Constructions  

Location: Redlands, Queensland

Services: Detailed Measurement, Cost Estimating, Cost Forecasting   

Details: Seymour Whyte Constructions was awarded the $80m fixed price, construct only contract to deliver road upgrades along the Cleveland-Redland Bay Road.

WestConnex M4-M5 Link Tunnels         

Client: Acciona Samsung Bouygues Joint Venture  

Location: Sydney, New South Wales  

Services: Change management and claims assistance   

Details: WestConnex - Australia’s largest integrated transport and urban revitalisation project by Sydney Motorway Corporation on behalf of the NSW Government. The M4-M5 Link Tunnels is the first stage of the M4-M5 Link that includes the construction of the M4-M5 Link Tunnels between the M4 at Haberfield and the M8 at St Peters and stub tunnels to the Rozelle Interchange. The project consists of twin-mainline tunnels between the M4 East at Haberfield and the New M5 at St Peters, passing under Haberfield, Leichhardt, Camperdown, Newtown, and St Peters. Each tunnel is approximately 7.5 km long and sized to accommodate up to four lanes of traffic in each direction. This link will create a western bypass of the CBD easing congestion and provides crucial support for Sydney’s long-term economic and population growth. 

WestConnex M8 Motorway  

Client: CPB Dragados Samsung Joint Venture 

Location: Sydney, New South Wales 

Services: Design cost management, value management procurement, contract administration, change management and claims assistance  

Details: The M8 tunnel is Stage 2 of WestConnex - Australia’s largest integrated transport and urban revitalisation project by Sydney Motorway Corporation on behalf of the NSW Government. It delivered approximately nine kilometres of new tunnels, motorway to motorway connections and a new interchange. 

North East Link (NEL) 

Client: SPARK Consortium 

Location: Melbourne, Victoria 

Services: Design cost management 

Details: North East Link is the biggest ever investment in Melbourne’s north-east. The project spans from Watsonia to Bulleen. 

M6 Stage 1 Motorway  

Client: CGU JV 

Location: Sydney, New South Wales 

Services: Design cost management, cost forecasting and reporting 

Details: The M6 Stage 1 includes twin four kilometre tunnels linking the M8 Motorway at Arncliffe to President Avenue at Kogarah. Ramps between the main motorway tunnel and the surface intersection at President Avenue. Provision of new shared cyclist and pedestrian pathways, motorway support infrastructure including tunnel ventilation systems and the motorway control centre, new service utilities including a permanent power supply line, and minor adjustments to local roads in the project area. 

Bruce Highway Upgrade - Deception Bay Road Interchange  

Client: BMD Constructions 

Location: Brisbane, Queensland 

Services: Claims Preparation and Defence 

Details: Providing 2 new parallel bridges over the Bruce Highway and removing the existing 2-lane bridge. Upgrading 2 signalised intersections on Deception Bay Road, 1 immediately west of the interchange at Old Gympie Road, and 1 immediately east of the interchange at Eastern Service Road. Increasing the length and capacity of existing on and off ramps. Providing active transport facilities for pedestrians and bike riders. 

Bruce Highway Upgrade - Smart Motorways Project  

Client: Seymour Whyte 

Location: Sunshine Coast, Queensland 

Services: Project remeasure, change management 

Details: The Bruce Highway – Pine River to Caloundra Road Smart Motorways (Stage 2) project will deliver additional Smart Motorways technology along a 60km section of the Bruce Highway between the Pine River and Caloundra Road.  

M1 Motorway - Coomera Connector - Stage 1 North  

Client: Acciona Georgiou Joint Venture (AGJV) 

Location: Gold Coast, Queensland 

Services: Bid preparation assistance, Design cost management, contract administration 

Details: By constructing additional crossings of the Coomera and Nerang rivers, Stage 1 of the Coomera Connector will reduce pressure on the M1 by providing an alternative route for the growing communities and commercial hubs of Helensvale and Coomera. The corridor is wide enough for an ultimate 6-lane motorway. The Stage 1 route will be built to 4 lanes to meet medium-term traffic needs. Stage 1 North includes new greenfields motorway from Shipper Drive to Helensvale Road. 

M1 Motorway - Coomera Connector - Stage 1 Central  

Client: Fulton Hogan Hull McIllwain Joint Venture (FHHMJV) 

Location: Gold Coast, Queensland 

Services: Bid preparation assistance, Design cost management 

Details: By constructing additional crossings of the Coomera and Nerang rivers, Stage 1 of the Coomera Connector will reduce pressure on the M1 by providing an alternative route for the growing communities and commercial hubs of Helensvale and Coomera. The corridor is wide enough for an ultimate 6-lane motorway. The Stage 1 route will be built to 4 lanes to meet medium-term traffic needs. Stage 1 Central includes new greenfields motorway from Helensvale Road to Smith Street Motorway. 

M1 Motorway - Palm Beach to Tugun (Package C)  

Client: Seymour Whyte 

Location: Gold Coast, Queensland 

Services: Measurement, change management 

Details: The Pacific Motorway (M1) between Palm Beach and Tugun (Package C) is the third and final section of the M1 Pacific Motorway Varsity Lakes to Tugun (VL2T) upgrade. Package C involves the widening of a 5km section of the motorway, between Nineteenth Avenue Overpass and the Tugun interchange. 

Transmission Gully (NZ)  

Client: CPB HEB Joint Venture 

Location: Wellington, New Zealand 

Services: Measurement, cost planning, schedule of quantities, commercial administration and insurance claims assessment 

Details: A 27 kilometre four-lane median divided motorway (through Transmission Gully) with interchanges connecting the route to Mackay, SH58, eastern Porirua and Kenepuru. 

Logan Enhancement Project (LEP) 

Client: CPB Contractors 

Location: Brisbane, Queensland 

Services: Tender measurement and design cost management 

Details: The $512 million Logan Motorway Enhancement project included realignment and widening the motorway from four to six lanes, new service roads and braided ramps. The project included interchange upgrades at key congestion hot spots on the Logan Motorway and widening parts of the Gateway Extension Motorway. 

Woolgoola to Ballina - Section 6 Main Civil Works  

Client: BMD Constructions 

Location: Yamba, New South Wales 

Services: Change management support 

Details: $100 million 14.9 kilometre highway upgrade between Illuka to Devils Pulpit as part of the $4.36 billion Woolgoolga to Ballina Pacific Motorway upgrade 

Bruce Highway Upgrade - Caloundra Rd to Sunshine Motorway (CR2SM) 

Client: Fulton Hogan Seymore Whyte Joint Venture 

Location: Sunshine Coast, Queensland 

Services: Project remeasure, change management and claims assistance 

Details: The Bruce Highway upgrade to six lanes between Caloundra Road and the Sunshine Motorway includes major upgrades to both interchanges and a new two-way service road for local traffic between Steve Irwin Way and Tanawha Tourist Drive. 

Gateway Upgrade North (GUN) 

Client: Lend Lease (for DTMR & Transurban QLD) 

Location: Brisbane, Queensland 

Services: Detailed measurement, design cost management and cost planning 

Details: The upgrade includes widening 11.3 kilometres of road from four to six lanes and improving safety and congestion for motorists. The scope also includes constructing an offroad cycle and pedestrian facility along the entire length of the project upgrade 

Kingsford Smith Drive Upgrade (KSD) 

Client: Lend Lease (for Brisbane City Council) 

Location: Brisbane, Queensland 

Services: Detailed measurement, design cost management, cost planning, forecasting assistance, commercial administration, dispute resolution and insurance claims assessment 

Details: The Kingsford Smith Drive upgrade involved widening seven kilometres of road from four to six lanes with considerable marine work along the Brisbane River.

Next
Next

RAIL